News

PROJECT CASE-JAW PLATE WITH TIC INSERT

PROJECT CASE-01

Project Background

The site is located in Dongping, Shandong province, China, with annual processing capacity of 2.8M tons hard iron ore, at grade of 29% iron with B.W.I. 15-16KWT/H.

The actual output has been suffered a lot due to the fast wearing out of regular manganese jaw liners.

They have been seeking for a proper wearing solution to greatly increase the liner’s life span, so as to reduce the downtime.

Solution

Mn13Cr2-TiC Jaw Plates

Applied for CT4254 Jaw Crusher

Results

- 26% Saved on the consumables cost per ton

- 116% Increased on Service life

Performance & Result

Part Material Mn13Cr2 Mn13Cr-TiC
Durations ( Days ) 13 28
Total Working Hours (H) 209.3 449.75
Total Productivity (T) 107371 231624
Price Per Set (USD) US$11,300.00 US$18,080.00
Cost Per Ton (USD) US$0.11 US$0.08

BEFORE-SWING JAW PLATE

PJ06

 

AFTER-SWING JAW PLATE

project case-03

BEFORE-FIXED JAW PLATE

PJ-05

AFTER-FIXED JAW PLATE

PJ-04


Post time: Aug-31-2023